Publications
Journal Papers
1. Konak, A., S. Kulturel-Konak, B. A. Norman, and A. E. Smith, “A New Mixed Integer Programming Formulation for Facility Layout Design Using Flexible Bays,” Operations Research Letters, Vol. 34, 660-672, 2006.
2.
Kulturel-Konak,
S., A. E. Smith, and B. A. Norman, “Multi-Objective Tabu Search Using a
Multinomial Probability Mass Function,” European Journal of Operational
Research, Vol. 169, No. 3,
918-931, 2006.
3.
4. Bidanda, B., P. Ariyawongrat, K. L. Needy, B. A.
Norman, and W. Tharmmaphornphilas, “Human Related Issues In Manufacturing Cell
Design, Implementation, And Operation: A Review & Survey,” Computers and Industrial Engineering, Vol.
48, 507–523, 2005.
5. Kulturel, S., B. A. Norman,
D. W. Coit and A. E. Smith, “Exploiting Tabu Search Memory In Constrained
Problems,” INFORMS Journal on Computing, Vol.
16, No. 3, 241-254, 2004.
6. Kulturel-Konak, S., A. E.
Smith, and B. A. Norman, “Layout Optimization Considering Production
Uncertainty and Routing Flexibility,” International
Journal of Production Research, Vol. 42, No. 21, 4475-4493, 2004.
7. Ozturk,
U. A., M. Mazumdar, and B. A. Norman, “A Solution to the Stochastic Unit
Commitment Problem Using Chance Constrained Programming,” IEEE
Transactions on Power Systems, Vol. 19, No. 3, 1589-1598,
2004.
8. Tharmmaphornphilas, W. and B. A. Norman, “A
Quantitative Method for Determining Proper Job Rotation Intervals,” Annals
of Operations Research special issue on Staff
Scheduling and Rostering: Theory and Applications, Vol. 128, 251-266, 2004.
10. Tharmmaphornphilas, W., B. Green, B. J. Carnahan,
and B. A. Norman, “Applying Mathematical Modeling to Create Job Rotation
Schedules for Minimizing Occupational Noise Exposure,” AIHA Journal, Vol. 64, 401-405, 2003.
11. Ozdemir, G., A. E. Smith,
and B. A. Norman, “Incorporating Heterogeneous Distance Metrics Within Block
Layout Design,” International Journal of
Production Research, Vol. 41, No.
5, 1045-1056, 2003.
12. Needy, K. L., B. A. Norman, B.
13. Kim, K., B. A. Norman, and
B. O. Nnaji, “Heuristics For Single-Pass Welding Task Sequencing,” International Journal of Production Research, Vol. 40, No. 12, 2769-2788, 2002.
15. Norman, B. A., W.
Tharmmaphornphilas, K. L. Needy, B. Bidanda and R. C. Warner, “Worker
assignment in cellular manufacturing considering technical and human skills,” International Journal of Production Research, Vol. 40, No. 6, 1479-1492, 2002.
17. Norman, B. A., A. E. Smith
and R. A. Arapoglu, “Integrated facilities design using a contour distance
metric,” IIE Transactions, Vol. 33,
No. 4, 337-344, 2001.
18. Gomes, C., O. Onipede, M.
Lovell, B. Norman, and J. Rajgopal, “Analysis of Springback Using Simulation
and Experimental Design,” Transactions of
NAMRI, 89-96, 2001.
19. Norman,
B. A., A. E. Smith, E. Yildirim and W. Tharmmaphornphilas, “An Evolutionary
Approach to Incorporating Intradepartmental Flow into Facilities Design,” Advances in Engineering Software, Vol.
32, No. 6, 443-453, 2001.
21. Norman, B. A. and J. C.
Bean, “Scheduling operations on parallel machine tools,” IIE Transactions, Vol. 32, No. 5, 449-459, 2000.
22. Carnahan, B. J., M. S.
Redfern, and B. A. Norman, “Designing safe job rotation schedules using
optimization and heuristic search,” Ergonomics,
Vol. 43, No. 4, 543-560, 2000.
23.
24. Norman, B. A. “Scheduling
Flowshops With Finite Buffers And Sequence Dependent Setup Times,” Computers and Industrial Engineering,
Vol. 36, No. 1, 163-177, 1999.
25. Norman, B. A. and J. C.
Bean, “A Random Keys Genetic Algorithm for Job Shop Scheduling Problems,” Engineering Design and Automation Journal,
Vol. 3, No. 2, 145-156, 1997.
26.
Gomes, C., O. Onipede, M. Lovell, B. Norman, and J.
Rajgopal, “Analysis of Springback Deformations in Anisotropic Sheet Steels,”
forthcoming in Journal of Materials Processing Technology.
27. Kulturel-Konak,
S., A. E. Smith, and B. A. Norman, “Multi-Objective
Facility Expansion And Relayout,” Technical Report 02-09, Department of
Industrial Engineering,
28. Tharmmaphornphilas,
W. and B. A. Norman, “A
Methodology to Create Robust Job Rotation Schedules,” accepted to Annals of Operations Research.
Journal Submissions
1. Al-Rumaih, D. Tipper, Y. Liu
and B. Norman, “A genetic algorithm approach to spare capacity planning in
survivable mesh networks,” submitted to Journal
of Network and System Management.
2.
Osman, A, R. Ries, and B. A.
Norman, “Life Cycle Optimization of
Building Energy Systems,” Technical Report 06-05, Department of Industrial
Engineering, University of Pittsburgh, 15261, 2006, submitted to Engineering Optimization.
3. Alagoz, O., B. A. Norman and A. E. Smith, “Determining
Aisle Structures For Facility Designs Using A Hierarchy Of Algorithms,” Technical Report 06-03, Department of
Industrial Engineering,
4.
Wang, M. E., B. A. Norman, and
L. Wang, “Preemption Traffic Network
Design for Fire Services,” Technical Report 06-04, Department of Industrial
Engineering, University of Pittsburgh, 15261, 2006, submitted to IIE Transactions.
5.
Nembhard, D. A. and B. A. Norman, “Productivity and Responsiveness with Cross-Trained
Teams for a Single Product Serial System,” Technical Report 02-02, Department of
Industrial Engineering,
6. Ozturk, U. A. and B. A. Norman, “The Wind Power
Plant Connection Problem: An Application of Network and Location Theory,”
Technical Report 02-08, Department of Industrial Engineering, University of
Pittsburgh, 15261, 2002 under revision European
Journal of Operational Research.
7.
Tharmmaphornphilas,
W. and B. A. Norman, “The Value of Information to Develop Job Rotation Plans to
Reduce Low Back Injuries,” Technical
Report 04-02, Department of Industrial Engineering, University of Pittsburgh, 15261,
2004, submitted to International
Journal of Industrial Ergonomics.
8.
Nembhard, D.
A., K. Prichanont and B. A. Norman,
“Heuristic Approaches For Assigning And Scheduling A Heterogeneous
Workforce,” Technical Report 04-06,
Department of Industrial Engineering,
9.
Wang, L., B. A. Norman and J.
Rajgopal, “Optimizing the
Placement of Multiple RFID Reader Antennas to Maximize Portal Read-Accuracy ,” Technical Report 07-01, Department of Industrial
Engineering, University of Pittsburgh, 15261, 2007, submitted to IEEE Transactions on Automation Science
and Engineering.
1.
Lodree, E.
J. and B. A. Norman, “Scheduling Models
for Optimizing Human Performance and Well-being,” Handbook of Production Scheduling, (J. W. Herrmann, editor),
Springer,
2.
Nembhard, D. A. and
B. A. Norman, “Cross-Training in Production Systems with Human Learning and
Forgetting,” Handbook of Industrial and Systems Engineering, (A. B. Badiru,
editor), CRC Press, Taylor and Francis, Boca Raton, FL, 2005, Chapter 16.
3. “Design of Production Facilities using
Evolutionary Computing,” A. E. Smith and B. A. Norman, Evolutionary Optimization, (R. Sarker, M. Mohammadian and X. Yao,
editors), Kluwer Academic Publishers,
4. “Evolutionary
design of facilities considering production uncertainty,” A. E. Smith and B. A.
Norman, Evolutionary Design and
Manufacture: Selected Papers from ACDM 2000 (I. C. Parmee, editor),
Springer-Verlag,
1. Kim, K. Y., B. A. Norman, B. O. Nnaji, D. G. Manley,
and Y. M. Zhang. An Integration
Framework for Virtual Assembly Analysis and Welding Task Sequencing. Proceedings of The International Conference
on e-Design, May, 2005,
2.
3.
Vidic, N., B. A.
Norman and D.A. Nembhard, “Worker assignment on a serial-line when productivity
is changing,” 14th Industrial Engineering
Research Conference, May, 2005,
4.
Wang, L., B. A.
Norman and M. E. Wang, “A methodology for consolidating fire services with
traffic signal preemption,” 14th
Industrial Engineering Research Conference, May, 2005, Atlanta, GA, CD Rom
Format.
5.
Wang, M. E., B.
A. Norman and L. Wang, “Preemptive traffic network design for fire service,” 14th Industrial Engineering Research
Conference, May, 2005,
6.
Li, C., B. A.
Norman and A. E. Smith, “The rack layout problem with stochastic profit and
demand,” 14th Industrial Engineering
Research Conference, May, 2005,
7.
8.
Osman, A., R.
Ries and B. A. Norman, “Life cycle assessment model: optimization of
cogeneration systems in buildings,” 14th
Industrial Engineering Research Conference, May, 2005,
9.
Kim, K. Y., B. A.
Norman, B. O. Nnaji, D. G. Manley, and Y. M. Zhang, “An Integration Framework
for Virtual Assembly Analysis and Welding Task Sequencing,” International
Conference on e-Design, May, 2005, Atlanta GA, CD Rom Format.
10. Tharmmaphornphilas,
Wipawee and B. A. Norman, “Job rotation plans for reducing low back injuries with real-time
information,” 13th Industrial Engineering Research Conference, May, 2004,
11.
12. Wang, M. E. and B. A. Norman, “Zoning and Backbone
Extraction for Preemptive Traffic Network Design,” 12th Industrial Engineering Research Conference, May, 2003,
13. Wang, M. E. and B. A. Norman, “Preemptive Traffic
Network Design,” 12th Industrial
Engineering Research Conference, May, 2003, Portland, OR, CD Rom Format.
14. Ozturk, U. A., M. Mazumdar, and B. A. Norman, “The
Effect of Considering the Correlation Structure of Hourly Demands on Unit
Commitment Solutions,” 12th Industrial
Engineering Research Conference, May, 2003,
15. Tharmmaphornphilas,
Wipawee and B. A. Norman, “A mathematical Analysis of Job
Rotation Interval Lengths,” The Fourth
Asia-Pacific Conference on Industrial Engineering and Management Systems,
Taipei, Taiwan, 2002, CD Rom Format.
16. Alagoz, O., B. A. Norman and
A. E. Smith “Designing aisle networks to facilitate material flow,” Progress
in Material Handling Research 2002 (Russell Meller, Michael K. Ogle, Brett
A. Peters, G. Don Taylor and John Usher, editors), The Material Handling
Institute, Charlotte, NC, 2002, 11-25.
17. Needy, K. L., B. A. Norman,
B. Bidanda, W. Tharmmaphornphilas, P. Ariyawongrat, and R. C. Warner, “Human
capital assessment in lean manufacturing,” American
Society for Engineering Management Proceedings, Huntsville, AL, 2001,
233-239.
18. Smith, A. E., G. Ozdemir, B.
A. Norman, “Explicitly incorporating multiple material handling systems within
block layout design,” Progress in Material Handling Research 2000, (R.J.
Graves, L. F. McGinnis, M.K. Ogle, B. A. Peters, R. E. Ward, and M.R. Wilhelm,
editors), The Material Handling Institute, Charlotte, NC, 2000, 330-339.
19. Tharmmaphornphilas,
W. and B. A. Norman, “A Heuristic Search Algorithm for Stochastic Job Rotation
Scheduling,” 9th Industrial Engineering
Research Conference, May 21-23, 2000, Cleveland, OH, CD Rom format.
20. Norman, B. A., W.
Tharmmaphornphilas, K. L. Needy, B. Bidanda and R. C. Warner, “Assigning
Workers to Tasks Considering Technical and Human Skills,” 9th Industrial Engineering Research Conference, May 21-23, 2000,
Cleveland, OH, CD Rom format.
21. Al-Rumaih,
A., D. Tipper, Y. Liu, and B. A. Norman, “Spare Capacity Planning for
Survivable Mesh Networks,” Lecture Notes
in Computer Science 1815, Proceedings
IFIP-TC6 Networking 2000,
22. Carnahan, B. J., M. S.
Redfern, and B. A. Norman, “A Genetic Algorithm for Designing Job Rotation
Schedules Considering Ergonomic Constraints,” Proceedings of the Congress on Evolutionary Computation,
Washington, D.C., July 1999, Published by IEEE Inc., 1093-1098.
23. Norman, B. A., A. E. Smith
and R. A. Arapoglu, “Integrated facility design using an evolutionary approach
with a subordinate network algorithm,” Parallel
Problem Solving from Nature (PPSN V) (A. E. Eiben, T. Baeck, M. Schoenauer
and H.-P. Schwefel, editors), Lecture Notes in Computer Science 1498,
Springer-Verlag, Berlin, Germany, 1998, 937-946.
24. Carnahan B.J., Redfern M.S.,
Norman B., “Genetic Algorithms Applied
to Problems in Job Rotation,” Advances in
Occupational Ergonomics and Safety: Proceedings of the XIIIth Annual
International Occupational Ergonomics and Safety Conference, Kumar S. (ed.)
IOS Press,
25.
26.
27. Norman, B. A. and A. E.
Smith, “Random Keys Genetic Algorithm With Adaptive Penalty Function For
Optimization Of Constrained Facility Layout Problems,” 1997 IEEE International Conference on Evolutionary Computation,
April 13-16, 1997, Indianapolis, IN, 407-411.
1. Norman,
B. A. and A. E. Smith, “Comprehensive redesign of industrial facilities,” Proceedings of the 2003 NSF Design and
Manufacturing Research Conference,
2. Needy, K. L., B. A. Norman,
B. Bidanda, “Workforce Development in Lean Manufacturing,” Proceedings of
the 9th Annual APICS E & R Foundation Summer
Academic/Practitioner Workshop, Wilmerding Pennsylvania, 2002, 81-85.
3. Norman,
B. A. and A. E. Smith, “Comprehensive redesign of industrial facilities,” Proceedings of the 2002 NSF Design and
Manufacturing Research Conference, San Juan, Puerto Rico, January 2002, CD
Rom format.
4. Norman,
B. A. and A. E. Smith, “Comprehensive redesign of industrial facilities,” Proceedings of the 2001 NSF Design and
Manufacturing Research Conference,
5. Norman,
B. A. and A. E. Smith, “Comprehensive redesign of industrial facilities,” Proceedings of the 2000 NSF Design and
Manufacturing Research Conference, Vancouver, BC, January 2000, CD Rom
format.
7. Ozdemir,
G., A. E. Smith, and B. A. Norman “Incorporating heterogeneous distance metrics
within block layout design,” Proceedings
of the Second Asia-Pacific Conference on Industrial Engineering and Management
Systems, Kanazawa, Japan, 1999, 213-216.
Also published in Proceedings of
the 1999 Second Japan-USA Joint Workshop on Intelligent Manufacturing Systems
(M. Gen. T. Yokota, A. E. Smith, G. A. Suer, R. W. Wolff and G. Yamazaki,
editors), Kanazawa, Japan, October 1999, 49-52.
8. Arapoglu, R. A., B. A.
Norman and A. E. Smith, “A genetic algorithm approach to input/output station
location in facilities design,” Proceedings
of the Second Japan-Australia Joint Workshop on Intelligent and Evolutionary
Systems, Kyoto, Japan, November 1998, 155-170.
9. A. E. Smith and B. A.
Norman, “Research in intelligent manufacturing systems at the
10. Chakravarthy, K. and B. A.
Norman, “Sequencing Jobs and Allocating Buffers in a Flowshop Environment,” 7th Industrial Engineering Research
Conference,
11. Carnahan, B. J., B. A.
Norman, and M. S. Redfern, “Assembly Line Balancing Considering Both Production
and Worker Constraints,” 7th Industrial
Engineering Research Conference,
12. Norman, B. A., A. E. Smith,
and R. A. Arapoglu, “An Efficient Algorithm for Using a Perimeter Distance
Metric in Unequal Area Facility Layout,” 7th
Industrial Engineering Research Conference, May 9-10, 1998, Banff, Alberta,
Canada, CD Rom format.
13. Bean, J. C., A. B.
Hadj-Alouane, and B. Norman, “Rescheduling Disrupted Production Systems,” Proceedings of the 1994 NSF Design and
Manufacturing Grantees Conference, 1994, 237-238.
14. Leemis, L. M. and B. A.
Norman, “Software for the Analysis of Survival Data,” Proceedings of the 23rd Annual
Other publications
1. Smith, A. E. Smith and B. A.
Norman, “New ways to consider production uncertainty and detailed design in
facilities layout,” IIE FAPAD Newsletter,
Spring 1998, 3-4.
2. Chakravarthy, K. and B. A.
Norman, “Job Sequencing and Buffer Allocation in a Flowshop with Limited
Buffers,” Technical Report, Department of Industrial Engineering,
3.
4. Norman, B. A. and J. C.
Bean, “A Genetic Algorithm Code for Scheduling Problems: Parallel Computing
Version,” Technical Report 94-23, Department of Industrial and Operations
Engineering,
5. Norman, B. A. and J. C.
Bean, “A Genetic Algorithm Code for Scheduling Problems: Serial Computing
Version,” Technical Report 94-22 , Department of Industrial and Operations
Engineering,